Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the forminator domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technica/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technica/public_html/wp-includes/functions.php on line 6114
Vilja tn 5 - Technical Consult

Наши Проекты

Для просмотра выберите проект из списка либо посмотрите другие проекты здесь в PDF.

Vilja tn 5

Расположение объекта: Vilja tn 5, Viimsi

Роль в проекте: Надзор собственника

Срок реализации проекта: 2021 - 2022

Технические данные, характеризующие проект: Общая площадь 180 m2

Задача: Осуществление надзора собственника при реконструкции фасада офисного здания (1172 м2), реконструкции арочных холлов (1340 м2), строительстве паркинга (1380 м2) и подаче заявки и получении разрешения на использование.

Свяжитесь с нами


Член правления: 
Илья Корнилов
envelopeuserphone-handsetcrossmenuchevron-down